Welcome to NexusFi: the best trading community on the planet, with over 150,000 members Sign Up Now for Free
Genuine reviews from real traders, not fake reviews from stealth vendors
Quality education from leading professional traders
We are a friendly, helpful, and positive community
We do not tolerate rude behavior, trolling, or vendors advertising in posts
We are here to help, just let us know what you need
You'll need to register in order to view the content of the threads and start contributing to our community. It's free for basic access, or support us by becoming an Elite Member -- see if you qualify for a discount below.
-- Big Mike, Site Administrator
(If you already have an account, login at the top of the page)
I have an indicator that draws a plot and a series of rectangles. Right now the plot is being drawn behind the rectangles. How can I change the order so that the plot is drawn over the rectangle?
Afshin
Can you help answer these questions from other members on NexusFi?
If I remember right, add ZOrder = x to the OnStartUp() section. For 'x' I cannot remember how it works, either higher or lower value takes precedence. So try something like ZOrder = -1.
Thanks for the reply. The issue I have is that I need to be able to set the ZOrder for individual drawing objects as well as the Plot inside the same indicator.
As far as I know this is not possible. When faced with the same problem I just run two copies of the same indicator on the same chart, with optional objects on or off and then use the usual Shift-mouse wheel to lift up/down the Z-order of one of the indicators.
(It may be possible using the direct object interface calls but I have no access to Ninja at present so cannot check.)